Sean Coggiola

Certifier BDC3269 · FutureCert Pty Ltd

Activity

7
applications
0
duplexes
0
dwellings $1M+
7
approved / determined
0
withdrawn / rejected
0%
modifications
$90k
median cost
$702k
total value
3
median days to decision

Applications lodged 9 June 2026 to 24 Sept 2026 in the councils we follow.

Registration

Registration
BDC3269 · register entry
Status
Current
Class
Building Surveyor - Unrestricted
Current period
24 Apr 2026 to 23 Apr 2027
Registered since
12 Feb 2019 (7 years)
Insurance
Certain Underwriters At Lloyd's, to 2 Apr 2027
Checked
5 Oct 2026
Registration history (11)
24 Apr 202623 Apr 2027Building Surveyor - UnrestrictedRegistered
10 Mar 20269 Mar 2027Building Surveyor - Restricted (class 1 and 10 buildings)Registered
8 Mar 20259 Mar 2026Building Surveyor - Restricted (class 1 and 10 buildings)Registered
8 Mar 20247 Mar 2025Building Surveyor - Restricted (class 1 and 10 buildings)Registered
8 Mar 20237 Mar 2024Building Surveyor - Restricted (class 1 and 10 buildings)Registered
6 Aug 2022Building Surveyor - Restricted (class 1 and 10 buildings)Expired
3 Feb 20225 Aug 2022Building Surveyor - Restricted (class 1 and 10 buildings)Suspended
6 Aug 20215 Aug 2022Building Surveyor - Restricted (class 1 and 10 buildings)Registered
6 Aug 20205 Aug 2021Building Surveyor - Restricted (class 1 and 10 buildings)Registered
6 Aug 20195 Aug 2020A3 - Accredited Certifier - Building Surveying Grade 3Registered
12 Feb 201911 Feb 2020A4 - Accredited Certifier - Building InspectorRegistered

Contact

Address
Level 17/123 Pitt Street, SYDNEY NSW 2000
Phone
02 8211 0465

Registration conditions

  1. Prior to the issue of a construction certificate or complying development certificate for a class 2-9 building, that is not required to be referred to Fire & Rescue NSW, under Part 3 - Division 3 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021, the certifier must apply to the Commissioner of Fire & Rescue NSW, for a 'FRNSW written report application'. However, the certifier is not required to refer a construction certificate application or a complying development certificate application to the Commissioner of Fire & Rescue NSW if:
    • a.The certificate is in respect of a stand-alone single storey class 5, 6, 7 or 8 building having a total floor area of 500m2 or less, and no performance solution is proposed to a building standard that relates to a performance requirement in the BCA relating to fire safety.
    • b.The certificate is in respect of a class 2 to 9 building that is being renovated, altered, improved or repaired, and no performance solution is proposed to a building standard that relates to a performance requirement in the BCA relating to fire safety.
    • c.The certificate is in respect of a stage of building work to a class 2 to class 9 building, and the following provisions of the BCA Volume 1 do not apply to that stage;· Section C concerning fire resistance; · Section E Part E1 concerning fire fighting equipment; · Section E Part E2 concerning smoke hazard management.
Show 3 more conditions
  1. When applying to the Commissioner of Fire & Rescue NSW for a 'FRNSW written report application' under condition 1 above, the certifier must inform the Commissioner that the application is being made to comply with condition 1 imposed on this certificate of registration under the provisions of the Mutual Recognition Act 1992 (MR Act) and include a copy of the certifiers certificate of registration with the schedule of conditions for the information of the Commissioner.
  2. The certifier must not issue a construction certificate or complying development certificate for building work to which condition 1 applies unless the certifier has taken into consideration the report issued by the Commissioner of Fire & Rescue NSW. However, the certifier may issue a construction certificate or complying development certificate for a building to which condition 1 applies without obtaining a report from the Commissioner of Fire & Rescue NSW in the following circumstances:
    • a.If the Commissioner of Fire & Rescue NSW notifies the certifier that a report will not be provided, orb. If the Commissioner of Fire & Rescue NSW fails to notify the certifier within 10 days after the receipt date of the application for report whether or not a report will be provided, orc. If the Commissioner of Fire & Rescue NSW has given notice within 10 days of the date of receipt of an application for a report that a report will be provided, and a report is not provided within 28 days of the date the application for a report was received by the Commissioner.4. If the certifier does not adopt a recommendation contained in a report provided by the Commissioner of Fire & Rescue NSW, the certifier must:
    • a.notify the Commissioner, Fire & Rescue NSW; andb. provide:
    • i.a copy of the construction certificate or the occupation certificate; and
    • ii.the reasons for not adopting a recommendation contained in the report.
  3. Within seven days of issuing an occupation certificate, in relation to a building that the certifier has been required to obtain a report from the Commissioner of Fire & Rescue NSW under condition 1 and which has been provided in accordance with the timeframes set by condition 3, the certifier must provide a copy of the occupation certificate to the Commissioner of Fire & Rescue NSW.

Councils

Randwick
3
Northern Beaches
2
Woollahra
1
City of Sydney
1

Top suburbs

Paddington
1
Randwick
1
South Coogee
1
Narrabeen
1
Maroubra
1
Freshwater
1
Alexandria
1

Duplex and dwelling ($1M+) applications

No duplex or dwelling applications yet.