Samy Mikhail

Certifier BDC2277 · Building Certifiers Pty Ltd

Activity

1
applications
0
duplexes
0
dwellings $1M+
0
approved / determined
0
withdrawn / rejected
100%
modifications
–
median cost
$0
total value
–
median days to decision

Applications lodged 29 Sept 2026 to 29 Sept 2026 in the councils we follow.

Registration

Registration
BDC2277 · register entry
Status
Current
Class
Building Surveyor - Unrestricted
Current period
26 May 2026 to 26 May 2031
Registered since
17 Oct 2014 (11 years)
Insurance
Certain Underwriters At Lloyd’s (100%), Led By W. R. Berkley Syndicate Management Limited, to 10 June 2027
Checked
5 Oct 2026
Registration history (10)
26 May 202626 May 2031Building Surveyor - UnrestrictedRegistered
26 May 202125 May 2026Building Surveyor - UnrestrictedRegistered
6 Mar 20215 Mar 2026Building Surveyor - Restricted (class 1 and 10 buildings)Registered
6 Mar 20205 Mar 2021A3 - Accredited Certifier - Building Surveying Grade 3Registered
6 Mar 20195 Mar 2020A3 - Accredited Certifier - Building Surveying Grade 3Registered
6 Mar 20185 Mar 2019A3 - Accredited Certifier - Building Surveying Grade 3Registered
6 Mar 20175 Mar 2018A3 - Accredited Certifier - Building Surveying Grade 3Registered
6 Mar 20165 Mar 2017A3 - Accredited Certifier - Building Surveying Grade 3Registered
6 Mar 20155 Mar 2016A3 - Accredited Certifier - Building Surveying Grade 3Registered
17 Oct 201416 Oct 2015A4 - Accredited Certifier - Building InspectorRegistered

Contact

Address
Suite 49, 2 O'connell Street, PARRAMATTA NSW 2150
Phone
02 8279 7844

Disciplinary decisions

Registration conditions

  1. Prior to the issue of a construction certificate or complying development certificate for a class 2-9 building, that is not required to be referred to Fire & Rescue NSW, under Part 3 - Division 3 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021, the certifier must apply to the Commissioner of Fire & Rescue NSW, for a ‘FRNSW written report application’. However, the certifier is not required to refer a construction certificate application or a complying development certificate application to the Commissioner of Fire & Rescue NSW if:
    • a.The certificate is in respect of a stand-alone single storey class 5, 6, 7 or 8 building having a total floor area of 500m2 or less, and no alternative solution is proposed to a building standard that relates to a performance requirement in the BCA relating to fire safety.
    • b.The certificate is in respect of a class 2 to 9 building that is being renovated, altered, improved or repaired, and no performance solution is proposed to a building standard that relates to a performance requirement in the BCA relating to fire safety.
    • c.The certificate is in respect of a stage of building work to a class 2 to class 9 building, and the following provisions of the BCA Volume 1 do not apply to that stage; · Section C concerning fire resistance; · Section E Part E1 concerning fire fighting equipment; · Section E Part E2 concerning smoke hazard management.
Show 5 more conditions
  1. When applying to the Commissioner of Fire & Rescue NSW for a ‘FRNSW written report application’ under condition 1 above, the certifier must inform the Commissioner that the application is being made to comply with condition 1 imposed on this certificate of registration under the provisions of the Mutual Recognition Act 1992 (MR Act) and include a copy of the certifiers certificate of registration with the schedule of conditions for the information of the Commissioner.
  2. The certifier must not issue a construction certificate or complying development certificate for building work to which condition 1 applies unless the certifier has taken into consideration the report issued by the Commissioner of Fire & Rescue NSW. However, the certifier may issue a construction certificate or complying development certificate for a building to which condition 1 applies without obtaining a report from the Commissioner of Fire & Rescue NSW in the following circumstances:
    • a.If the Commissioner of Fire & Rescue NSW notifies the certifier that a report will not be provided, or
    • b.If the Commissioner of Fire & Rescue NSW fails to notify the certifier within 10 days after the receipt date of the application for report whether or not a report will be provided, or
    • c.If the Commissioner of Fire & Rescue NSW has given notice within 10 days of the date of receipt of an application for a report that a report will be provided, and a report is not provided within 28 days of the date the application for a report was received by the Commissioner.
  3. If the certifier does not adopt a recommendation contained in a report provided by the Commissioner of Fire & Rescue NSW, the certifier must:
    • a.notify the Commissioner, Fire & Rescue NSW; and
    • b.provide:
    • i.a copy of the construction certificate or the occupation certificate; and
    • ii.the reasons for not adopting a recommendation contained in the report.
  4. Within seven days of issuing an occupation certificate, in relation to a building that the certifier has been required to obtain a report from the Commissioner of Fire & Rescue NSW under condition 1 and which has been provided in accordance with the timeframes set by condition 3, the certifier must provide a copy of the occupation certificate to the Commissioner of Fire & Rescue NSW.
  5. For a period of three (3) years commencing from 20/11/2025:(1) for each development where the Registered Certifier is appointed the principal certifier or is exercising a function of a principal certifier, the Registered Certifier must personally carry out, and not delegate to any other person:(a) a minimum of one (1) site inspection and create a record of whether the existing site conditions are consistent with the plans and specifications of the relevant complying development application after receiving an application for a complying development certificate and before determining the application; and (b) the first required critical stage inspection for the development.

Councils

Canterbury-Bankstown
1

Top suburbs

Bankstown
1

Duplex and dwelling ($1M+) applications

No duplex or dwelling applications yet.