Nicholas Aitchison

Certifier BDC3040 · Group DLA (NSW) Pty Ltd

Activity

55
applications
0
duplexes
0
dwellings $1M+
55
approved / determined
0
withdrawn / rejected
2%
modifications
$272k
median cost
$48.89M
total value
0
median days to decision

Applications lodged 9 June 2026 to 9 Oct 2026 in the councils we follow.

Registration

Registration
BDC3040 · register entry
Status
Current
Class
Building Surveyor - Unrestricted
Current period
28 July 2026 to 27 July 2027
Registered since
29 Sept 2017 (9 years)
Insurance
Probitas 1492 (Pacific) Pty Ltd On Behalf Of Probitas Syndicate 1492 At Lloyd’s Of London, to 2 Oct 2026
Checked
5 Oct 2026
Registration history (10)
28 July 202627 July 2027Building Surveyor - UnrestrictedRegistered
26 July 202527 July 2026Building Surveyor - UnrestrictedRegistered
26 July 202425 July 2025Building Surveyor - UnrestrictedRegistered
26 July 202325 July 2024Building Surveyor - UnrestrictedRegistered
29 Sept 202228 Sept 2023Building Surveyor - Restricted (class 1 and 10 buildings)Registered
29 Sept 202128 Sept 2022Building Surveyor - Restricted (class 1 and 10 buildings)Registered
29 Sept 202028 Sept 2021Building Surveyor - Restricted (class 1 and 10 buildings)Registered
29 Sept 201928 Sept 2020A3 - Accredited Certifier - Building Surveying Grade 3Registered
29 Sept 201828 Sept 2019A3 - Accredited Certifier - Building Surveying Grade 3Registered
29 Sept 201728 Sept 2018A3 - Accredited Certifier - Building Surveying Grade 3Registered

Contact

Address
Shop 1/264 George Street, Suite 34.01, SYDNEY NSW 2000
Phone
02 8355 3160

Registration conditions

  1. Prior to the issue of a construction certificate or complying development certificate for a class 2-9 building, that is not required to be referred to Fire & Rescue NSW, under Part 3 - Division 3 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021, the certifier must apply to the Commissioner of Fire & Rescue NSW, for a ‘BPB Condition Report’. However, the certifier is not required to refer a construction certificate application or a complying development certificate application to the Commissioner of Fire & Rescue NSW if:
    • a)The certificate is in respect of a stand-alone single storey class 5, 6, 7 or 8 building having a total floor area of 500m2 or less, and no performance solution is proposed to a building standard that relates to a performance requirement in the BCA relating to fire safety.
    • b)The certificate is in respect of a class 2 to 9 building that is being renovated, altered, improved or repaired, and no performance solution is proposed to a building standard that relates to a performance requirement in the BCA relating to fire safety.
    • c)The certificate is in respect of a stage of building work to a class 2 to class 9 building, and the following provisions of the BCA Volume 1 do not apply to that stage;
    • i.Section C concerning fire resistance;
    • ii.Section E Part E1 concerning fire fighting equipment;
    • iii.Section E Part E2 concerning smoke hazard management.
Show 4 more conditions
  1. When applying to the Commissioner of Fire & Rescue NSW for a ‘BPB Condition Report’ under condition 1 above, the certifier must inform the Commissioner that the application is being made to comply with condition 1 imposed on this certificate of registration under the provisions of the Mutual Recognition Act 1992 (MR Act) and include a copy of the certifiers certificate of registration with the schedule of conditions for the information of the Commissioner.
  2. The certifier must not issue a construction certificate or complying development certificate for building work to which condition 1 applies unless the certifier has taken into consideration the report issued by the Commissioner of Fire & Rescue NSW. However, the certifier may issue a construction certificate or complying development certificate for a building to which condition 1 applies without obtaining a report from the Commissioner of Fire & Rescue NSW in the following circumstances:
    • a)If the Commissioner of Fire & Rescue NSW notifies the certifier that a report will not be provided, or
    • b)If the Commissioner of Fire & Rescue NSW fails to notify the certifier within 10 days after the receipt date of the application for report whether or not a report will be provided, or
    • c)If the Commissioner of Fire & Rescue NSW has given notice within 10 days of the date of receipt of an application for a report that a report will be provided and a report is not provided within 28 days of the date the application for a report was received by the Commissioner.
  3. If the certifier does not adopt a recommendation contained in a report provided by the Commissioner of Fire & Rescue NSW, the certifier must:
    • a)notify the Commissioner, Fire & Rescue NSW; and
    • b)provide:
    • i.a copy of the construction certificate or the occupation certificate; and
    • ii.the reasons for not adopting a recommendation contained in the report.
  4. Within seven days of issuing an occupation certificate, in relation to a building that the certifier has been required to obtain a report from the Commissioner of Fire & Rescue NSW under condition 1 and which has been provided in accordance with the timeframes set by condition 3, the certifier must provide a copy of the occupation certificate to the Commissioner of Fire & Rescue NSW.

Councils

City of Sydney
50
Northern Beaches
2
Randwick
1
Bayside
1
Canterbury-Bankstown
1

Top suburbs

Sydney
30
The Rocks
8
Haymarket
4
Newtown
2
Surry Hills
2
Alexandria
2
Kensington
1
Botany
1
Davidson
1
Frenchs Forest
1

Duplex and dwelling ($1M+) applications

No duplex or dwelling applications yet.