Activity

5
applications
1
duplexes
0
dwellings $1M+
5
approved / determined
0
withdrawn / rejected
0%
modifications
$127k
median cost
$3.07M
total value
12
median days to decision

Applications lodged 24 June 2026 to 31 Aug 2026 in the councils we follow.

Registration

Registration
BDC04743 · register entry
Status
Current
Class
Building Surveyor - Restricted (all classes of building)
Current period
27 Mar 2026 to 26 Mar 2027
Registered since
20 Aug 2021 (5 years)
Insurance
Liberty Specialty Markets, to 28 Mar 2027
Checked
5 Oct 2026
Registration history (7)
27 Mar 202626 Mar 2027Building Surveyor - Restricted (all classes of building)Registered
27 Mar 202526 Mar 2026Building Surveyor - Restricted (all classes of building)Registered
8 Apr 20257 Apr 2026Building Surveyor - Restricted (class 1 and 10 buildings)Registered
6 Apr 20247 Apr 2025Building Surveyor - Restricted (class 1 and 10 buildings)Registered
6 Apr 20235 Apr 2024Building Surveyor - Restricted (class 1 and 10 buildings)Registered
20 Aug 202221 Aug 2023Building InspectorRegistered
20 Aug 202119 Aug 2022Building InspectorRegistered

Contact

Address
Unit 1/12 Laycock Avenue, CRONULLA NSW 2230
Phone
1300 368 534

Registration conditions

  1. Referral of certain matters to Fire & Rescue New South Wales prior to issue of construction certificate and complying development certificate.a) In addition to the requirements of Part 3 - Division 3 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021, the certifier must also as soon as practicable after receiving an application for a construction certificate, or a complying development certificate that proposes building work, submit to the Commissioner of Fire & Rescue NSW for assessment and comment:
    • i.a copy of the application, and an accompanying letter to the Commissioner that the application is being referred to the Commissioner so as to comply with this condition of registration imposed under the provisions of the Mutual Recognition Act 1992 and is to include a copy of the certifier’s certificate of registration with this schedule of conditions for the information of the Commissioner.
    • ii.a copy of the plans and specifications for the building, and
    • iii.where the building work proposed includes a Performance Solution relating to fire safety under the Building Code of Australia: (a) details of the performance requirements that the performance solution is intended to meet, and(b) details of the assessment methods to be used to establish compliance with those performance requirements,Except in the following cases:
    • i.the application is in respect of a stand-alone single storey Class 5, 6, 7 or 8 building having a total floor area of 500m2 or less and no performance solution is proposed to a building standard that relates to a performance requirement in the Building Code of Australia (BCA) relating to fire safety, or
    • ii.the application is in respect of a stage of building work to a Class 2 to Class 9 building and the provisions of BCA Volume 1 regarding Section C concerning fire resistance, Part E1 concerning firefighting equipment and Part E2 concerning smoke hazard management do not apply to that building work, or
    • iii.the application is in respect of a Class 2 to Class 9 building that is being renovated, altered, improved or repaired; and no performance solution is proposed to a building standard that relates to a performance requirement in the Building Code relating to fire safety.b) The certifier must not issue a construction certificate or complying development certificate for a building to which this condition applies unless:
    • i.the certifier has received written comment from Fire & Rescue NSW in relation to the matters referred, and the certifier has taken that comment into consideration; or
    • ii.at least 23 business days have elapsed since the plans and specifications were received by the Fire & Rescue NSW, and no written comment has been received by the certifier.c) Recommendations of Fire & Rescue NSW The certifier can set aside or amend the recommendations of the Fire & Rescue NSW in relation to the issue of a complying development certificate or construction certificate, only if the certifier notifies the Fire & Rescue NSW in writing within 14 days of the decision, and reasons for that decision.d) Compliance with the requirement that the terms of a recommended condition be included in the plans and specifications for building work is sufficiently complied with:
    • i.if the plans and specifications are redrawn so as to accord with those terms, or
    • ii.if those terms are included by way of an annotation (whether by way of insertion, deletion or alteration) marked on the relevant part of those plans and specifications.2) Provide a copy of an occupation certificate to Fire & Rescue New South Wales for certain buildings. The certifier must give a copy of any occupation certificate issued in relation to building work to which condition 1 above applies, to the Commissioner of Fire & Rescue NSW within 7 days.

Councils

Canterbury-Bankstown
2
Bayside
2
Northern Beaches
1

Top suburbs

Rockdale
2
Seaforth
1
Riverwood
1
Revesby
1

Duplex and dwelling ($1M+) applications

1
2026-07-1396 Bransgrove Road Revesby 2212Canterbury-BankstownDuplex$1.02MApproved