Activity
21
applications
0
duplexes
0
dwellings $1M+
21
approved / determined
0
withdrawn / rejected
0%
modifications
$50k
median cost
$2.92M
total value
0
median days to decision
Applications lodged 9 June 2026 to 7 Oct 2026 in the councils we follow.
Registration
- Registration
- BDC2376 · register entry
- Status
- Current
- Class
- Building Surveyor - Unrestricted
- Current period
- 16 May 2026 to 17 May 2027
- Registered since
- 13 May 2015 (11 years)
- Conditions
- 2 conditions, see below
- Insurance
- Certain Underwriters At Lloyd's, to 31 Mar 2027
- Checked
- 5 Oct 2026
Registration history (14)
| 16 May 2026 | 17 May 2027 | Building Surveyor - Unrestricted | Registered |
| 16 May 2025 | 15 May 2026 | Building Surveyor - Unrestricted | Registered |
| 16 May 2025 | 15 May 2026 | Building Surveyor - Unrestricted | Registered |
| 14 May 2025 | Building Surveyor - Unrestricted | Expired | |
| 14 May 2024 | 13 May 2025 | Building Surveyor - Unrestricted | Registered |
| 13 May 2023 | 13 May 2024 | Building Surveyor - Unrestricted | Registered |
| 13 May 2022 | 12 May 2023 | Building Surveyor - Unrestricted | Registered |
| 13 May 2021 | 12 May 2022 | Building Surveyor - Unrestricted | Registered |
| 13 May 2020 | 12 May 2021 | A1 - Accredited Certifier - Building Surveying Grade 1 | Registered |
| 13 May 2019 | 12 May 2020 | A1 - Accredited Certifier - Building Surveying Grade 1 | Registered |
| 13 May 2018 | 12 May 2019 | A1 - Accredited Certifier - Building Surveying Grade 1 | Registered |
| 13 May 2017 | 12 May 2018 | A1 - Accredited Certifier - Building Surveying Grade 1 | Registered |
| 13 May 2016 | 12 May 2017 | A1 - Accredited Certifier - Building Surveying Grade 1 | Registered |
| 13 May 2015 | 12 May 2016 | A1 - Accredited Certifier - Building Surveying Grade 1 | Registered |
Contact
- Address
- Level 57/19-29 Martin Place, SYDNEY NSW 2000
- Phone
- 02 9236 7373
Registration conditions
- Prior to the issue of a construction certificate in relation to a construction certificate application that is not required to be referred to Fire & Rescue NSW under clause 27 Part 3 - Division 3 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021 the certifier must obtain a report from and consent of the Commissioner of Fire & Rescue NSW for an application which involves any of the following fire safety matters if those matters do not comply with the deemed-to-satisfy provisions of the Building Code of Australia (BCA):(a) fire hydrants;(b) fire hose reels;(c) fire control centres or fire control rooms;(d) fire precautions during construction;(e) fire mains;(f) control valves;(g) booster assemblies;(h) emergency vehicle access;(i) fire indicator panels;(j) proscenium curtain drencher systems;(k) fire services controls in passenger lift cars. The certifier may proceed to determine the application referred to above without a report or consent being obtained from the Commissioner of Fire & Rescue NSW if a copy of the report is not supplied by the Commissioner of Fire & Rescue NSW within 23 days of receiving that request from the certifier.2. When applying to the Commissioner of Fire & Rescue NSW for a report under condition 1 above, the certifier must inform the Commissioner that the application is being made so as to comply with condition 1 above of his certificate of registration imposed under the provisions of the Mutual Recognition Act 1992 and include a copy of the certificate of registration with the schedule of conditions for the information of the Commissioner.3. (a) In a report given under condition 1 above, the Commissioner of Fire & Rescue NSW may consent to a variation of the requirements of the BCA (with or without conditions) if the Commissioner is satisfied that a satisfactory degree of fire safety is achieved. The certifier must implement all recommendations and conditions contained in that report. (b) Except as provided by condition
Show 1 more condition
- (a) above, the certifier is not required to implement any of the recommendations in the report provided by the Commissioner of Fire & Rescue NSW if those recommendations relate to matters other than those prescribed in condition 1 above.4. For any fire safety requirements that do not comply with the deemed-to-satisfy provisions of the BCA (including those conditions listed in condition 1 above) the certifier must obtain from either a class of Certifier – Fire Safety or an unconditional Building Surveyor - Unrestricted either or both of the following:(a) A compliance certificate referred to in Section 6.4 (e) (iv) of the Environmental Planning and Assessment Act 1979 (EP&A Act) that certifies that the performance solution complies with the relevant performance requirements of the BCA; or(b) A written report that includes a statement that the performance solution complies with the relevant performance requirements of the BCA.5. Prior to issuing a construction certificate or complying development certificate that incorporates a performance solution for a bushfire performance requirement (as defined in section 105 of the Victorian Building Regulations 2006) the certifier must obtain from either a class of Certifier – Fire Safety or an unconditional class of Building Surveyor - Unrestricted either or both of the following:(a) A compliance certificate referred to in Section 6.4 (e) (iv) of the Environmental Planning and Assessment Act 1979 (EP&A Act) that certifies that the performance solution complies with the relevant performance requirements of the BCA; or (b) A written report that includes a statement that the performance solution complies with the relevant performance requirements of the BCA.
Councils
Inner West
5
Northern Beaches
5
City of Sydney
5
Canterbury-Bankstown
3
Bayside
1
Ku-ring-gai
1
Wollongong
1
Top suburbs
Marrickville
3
Bankstown
2
Alexandria
2
Revesby
1
Ashfield
1
Balmain
1
Gordon
1
Narrabeen
1
Dee Why
1
Rosebery
1
Duplex and dwelling ($1M+) applications
No duplex or dwelling applications yet.