Alan Izadfar

Certifier BDC04659 · Alan Certifiers Pty Ltd

Activity

2
applications
1
duplexes
1
dwellings $1M+
2
approved / determined
0
withdrawn / rejected
0%
modifications
$1.00M
median cost
$2.00M
total value
3.5
median days to decision

Applications lodged 15 June 2026 to 13 Aug 2026 in the councils we follow.

Registration

Registration
BDC04659 · register entry
Status
Current
Class
Building Surveyor - Restricted (all classes of building)
Current period
3 Dec 2025 to 4 Dec 2028
Registered since
29 Mar 2021 (5 years)
Insurance
Certain Underwriters At Lloyd’s (100%), Led By W. R. Berkley Syndicate Management Limited, to 28 July 2027
Checked
5 Oct 2026
Registration history (6)
3 Dec 20254 Dec 2028Building Surveyor - Restricted (all classes of building)Registered
3 Dec 20242 Dec 2025Building Surveyor - Restricted (all classes of building)Registered
1 Dec 20232 Dec 2024Building Surveyor - Restricted (all classes of building)Registered
2 Mar 20231 Mar 2024Building Surveyor - Restricted (class 1 and 10 buildings)Registered
29 Mar 202228 Mar 2023Building InspectorRegistered
29 Mar 202128 Mar 2022Building InspectorRegistered

Contact

Address
Suite 201/79 Longueville Road, LANE COVE NSW 2066
Phone
0416 098 683

Registration conditions

  1. (a) Prior to the issue of a construction certificate, the certifier must apply to the Commissioner of Fire & Rescue NSW for an Initial Fire Safety Report for an application that proposes building work for Class 2 to 9 buildings, which1) requires the installation of any special fire service listed in Schedule 1; or2) includes a Performance Solution within the meaning of the Building Code of Australia1, assessed against the performance requirements of the Building Code of Australia Volume 1, for a fire safety system, that includes fire safety management procedures as a condition of the use and occupation of the building.The certifier must submit to the Fire & Rescue NSW for assessment and comment:
    • a.a copy of the application, and an accompanying letter to the Commissioner that the application is being referred to the Commissioner so as to comply with this condition of registration imposed under the provisions of the Mutual Recognition Act 1992 and is to include a copy of the certifier’s certificate of registration with this schedule of conditions for the information of the Commissioner.
    • b.a copy of the plans and specifications for the building, andc. where the building work proposed includes a Performance Solution relating to fire safety under the Building Code of Australia1:
    • i.details of the performance requirements that the performance solution is intended to meet, and
    • ii.details of the assessment methods to be used to establish compliance with those performance requirements.NOTE: The application assessment jurisdiction of the Fire & Rescue NSW is limited to: special fire services – the matters mentioned in Schedule 2 Performance Solutions relating to fire safety – the BCA(b) The certifier must not issue a construction certificate for a building to which condition 1 applies unless he has taken into consideration an Initial Fire Safety Report issued by the Commissioner of Fire & Rescue NSW. However, the certifier may issue a construction certificate for a building to which condition 1 applies without obtaining an Initial Fire Safety Report being provided by the Commissioner of Fire & Rescue NSW in the following circumstances:
    • a.If the Commissioner notifies the certifier that an Initial Fire Safety Report will not be provided, orb. If the Commissioner fails to notify the certifier within 10 days after the receipt date of the application for an Initial Fire Safety Report whether or not an Initial Fire Safety Report will be provided, orc. If the Commissioner has given notice within 10 days of the date of receipt of an application for an Initial Fire Safety Report that an Initial Fire Safety Report will be provided and an Initial Fire Safety Report is not provided within 28 days of the date the application for an Initial fire Safety Report was received by the Commissioner. (c) If the certifier does not adopt any recommendation in the comments made by the Fire and Rescue NSW:
    • a.because the comments had not been received when the construction certificate was issued; orb. because the certifier does not agree with the recommendation, the certifier must cause written notice to be given to the Fire & Rescue NSW of the fact that the certifier has not adopted the recommendation and of the reasons why the certifier has not adopted the recommendation.(d) Compliance with the requirement that the terms of a recommended condition be included in the plans and specifications for building work is sufficiently complied with:
    • a.if the plans and specifications are redrawn so as to accord with those terms, orb. if those terms are included by way of an annotation (whether by way of insertion, deletion or alteration) marked on the relevant part of those plans and specifications.2. (a) All construction certificates issued by the certifier for building work which requires the installation of any special fire service listed in Schedule 1 must have a condition attached which requires the person carrying out the building work to give the certifier and the Fire & Rescue NSW notification for inspection and testing as follows:
    • a.while installation of the special fire services is being carried out but before installation is completed- a notice to inspect the installation of the special fire services; andb. after installation of the special fire services but before interior surface finishes are applied—a notice to test the special fire services.(b) The certifier must not issue an occupation certificate for building work to which this condition applies until:
    • a.the Fire & Rescue NSW have received notification for inspection and testing and subsequently have given the certifier written advice that:
    • i.they do not propose to inspect the special fire service; or
    • ii.they have inspected the special fire services and found that they:1. comply with the relevant requirements; or2. do not comply with the relevant requirements and the reasons why they do not comply; orb. at least 23 business days have elapsed since notification for inspection and testing has been received by the Fire & Rescue NSW and no written advice has been given. NOTE: The inspection jurisdiction of the Fire & Rescue NSW is limited to the matters mentioned in Schedule
Show 4 more conditions
  1. (c) On receiving written advice from the Fire & Rescue NSW, the certifier must accept the advice and act on it unless, within 5 business days after receiving the advice, he gives written notice to the Fire & Rescue NSW –a. disagreeing with the advice; andb. stating the reasons for disagreeing.3.The certifier cannot set aside a recommendation of the Fire & Rescue NSW without obtaining a compliance certificate from an independent accredited certifier who is a registered certifier – Fire Safety4. The certifier is not to undertake any certification work in relation to complying development certificates.Note:1 Building Code of Australia1, Part A1 (Interpretation), Section A1.1 (Definitions) - “Performance Solution” means a Building Solution which complies with the Performance Requirements other than by reason of satisfying the Deemed-to-Satisfy Provisions. SCHEDULE 1 - SPECIAL FIRE SERVICES Fire mains (other than fire mains that connect only fire hose reels) Fire hydrants Sprinklers (including wall-wetting sprinklers) Special automatic fire suppression systems (including foam, deluge and gas flooding systems) Fire detection and alarm systems (other than stand-alone smoke alarms not required to be interconnected or connected to a fire indicator panel) Fire control centres Stairwell pressurisation systems Air-handling systems used for smoke control Smoke and heat venting systems Smoke exhaust systems Emergency warning and intercommunication systems Emergency lifts Services required under BCA, clause E1.10. SCHEDULE 2 - SPECIAL FIRE SERVICES (ASSESSMENT BY FIRE AUTHORITY)1. Fire fighting equipment provisions for connection of fire authority portable relay booster pump location and suitability of booster connections and enclosures location of fixed pump-set controls and status indication location and suitability of internal and roof hydrants and external hydrants including fire separation from adjacent buildings provisions for hard standing for fire appliances provision of additional hydrant services as mentioned in AS 2419.
  2. Sprinklers the location of valve room, pump-sets, water alarm and booster point location of pump-set controls and status indications provision of direct fire service alarm and location of directional signs provision of suitable fire-protection for special hazards as mentioned in AS 2118.
  3. Wall-wetting sprinklers location of isolating valves provision of suitable signs.
  4. Special automatic fire suppression systems· location of control valves· provision of access for fire service vehicles· suitability of extinguishment media· provision of interface with other systems and direct fire authority alarm.5. Fire detection and alarm systems (other than stand-alone smoke alarms not required to be interconnected or connected to a fire indicator panel)· location of main fire indicator panel, sub-indicator panels, mimic panels, local alarm bells and directional signs· suitability of weather protection, accessibility and lighting of equipment· provision of direct fire service alarm· suitability of nominated types of detection in all areas, and the location of manual call points.6. Fire control centres· location and size of control centre· suitability of contents of control centre.7. Provisions for special hazards· Suitability of special fire services for the protection of special hazards as mentioned in BCA, clause E1.10.8. Smoke and control systems· suitability of operational controls and indicators· automatic detector operation of stairwell pressurisation systems, smoke-and-heat vents and smoke exhaust systems.9. Emergency lifts· Provision of fire officer’s controls in lifts.10. Emergency warning and intercommunication systems· provision of suitable auxiliary warning devices, where AS 2220 systems are not specified· suitability of interface of warning system with detection and alarm systems· location of main emergency control panel and warden intercom points.SCHEDULE 3 - SPECIAL FIRE SERVICES (INSPECTION BY FIRE AUTHORITY)1. Fire fighting equipment· provisions for connection of fire authority portable relay booster pump· location and suitability of booster connections and enclosures· operation of fixed pump-set controls and status indication· location and suitability of internal and roof hydrants and external hydrants including fire separation from adjacent buildings· provisions for hard standing for fire appliances· provision of additional hydrant services as mentioned in AS 2419 achievement of specified performance.2. Sprinklers· the location of valve room, pump-sets, water alarm and booster point· operation of pump-set controls and status indications· operation of direct fire service alarm and location of directional signs· provision of suitable fire-protection for special hazards as mentioned in AS 2118.3. Wall-wetting sprinklers· location of isolating valves· provision of suitable signs.4. Special automatic fire suppression systems· location of control valves· provision of access for fire service vehicles· suitability of extinguishment media· provision of interface with other systems and direct fire service alarm· achievement of specified performance.5. Fire detection and alarm systems (other than stand-alone smoke alarms not required to be interconnected or connected to a fire indicator panel)· location and operation of main fire indicator panel, sub-indicator panels, mimic panels, local alarm bells and directional signs· suitability of weather protection, accessibility and lighting of equipment· operation of direct fire service alarm· suitability of nominated types of detection in all areas, and the location of manual call points· achievement of specified performance of detection and alarm systems.6. Fire control centres· location of control centre· suitability of contents, ventilation, signage, lighting and sound levels of control centre.7. Provisions for special hazards· Suitability of special fire services for the protection of special hazards as mentioned in BCA, clause E1.10.8. Smoke control systems· suitability of operational controls and indicators· suitability of automatic detector operation of stairwell pressurisation systems, smoke-and-heat vents and smoke exhaust systems· achievement of specified performance of systems.9. Emergency lifts· Operation of fire officer’s controls in lifts.10. Emergency warning and intercommunication systems· operation of suitable auxiliary warning devices, where AS 2220 systems are not specified· operation of interface of warning system with detection and alarm systems· location of main emergency control panel and warden intercom points · suitability of warning tone and sound pressure levels under test.

Councils

Ku-ring-gai
1
Canterbury-Bankstown
1

Top suburbs

St Ives Chase
1

Duplex and dwelling ($1M+) applications

2
2026-08-133 Phillip Road St Ives Chase 2075Ku-ring-gaiDwelling$1.10MApproved
2026-06-151a Donnington Avenue, Georges HallCanterbury-BankstownDuplex$900kApproved